The Higashi Shinagawa district, in which our First through Third Data Centers are located, is positioned on the government-planned optical fiber route installed between Shibuya and Odaiba. Different carriers have already laid fiber optic cables in the data centers. Optimal network environments suiting our customers' needs are readily available.
Floor load
Slab = 1,500 kg/m2
Raised floor = 500 kg/m2
Power-receiving system
Extra-high-voltage power of 66,000 V through a loop power-receiving system
UPS/CVCF
n+1 redundant configuration
Emergency power-generating equipment
Emergency gas turbine power generator
Air conditioning system
Air-cooling type, n+1 redundant configuration
Gas fire extinguishing equipment
Ultrasensitive smoke detectors
Gas harmless to humans and equipment
Security system
Contactless IC cards, identification numbers, manned reception
Surveillance cameras
Console sets, tools, PHS
Lent at no charge
Relaxation area
Massage chairs